Shah-Habshan-Ruwais Railway Project (Stage 1) - Track Power System and Mirfa Depot

The system scope is maintaining service continuity of electricity feeding for all utilities along the railway.


We developed the software of PLCs for all the 15 substations located along the railway and the depot
Each substation is feeding a different number of PMTs (Pad Mounted Transformer) and one SWS (Switching station). All PMTs are feeding all utilities along the railway.
With the system is in automatic mode, if a power failure or an earth fault occur, PLCs are programmed to do a change-over between substation and/or SWS so as to isolate the problem and do not stop feeding the utilities
All PLCs interface with a SCADA system from which is possible to operate manually and remotely circuit breakers located in substations

System architecture:
  • No.15 Wago PLC 750-8202
Used Softwares:
  • CoDeSys v2.3: PLC programming